000 | 01665cam^a2200481Ia^4500 | ||
---|---|---|---|
001 | UDM01000077027 | ||
003 | UDM | ||
005 | 20210531205259.0 | ||
008 | 020809s2001^^^^flua^^^^^b^^^^001^0^eng^d | ||
020 | _a1574442937 | ||
040 |
_aOKU _cOKU _dUN@ |
||
082 | 0 | 4 |
_a658.5 _bS377m 2001 |
100 | 1 |
_9105243 _aSchragenheim, Eli, _eautor |
|
245 | 1 | 0 |
_aManufacturing at warp speed : _boptimizing supply chain financial performance / _cEli Schragenheim, H. William Dettmer. |
264 | 3 | 1 |
_aBoca Raton, Fla. : _bSt. Lucie Press ; _aAlexandria, Va. : _bAPICS, _c2001. |
300 |
_axxviii, 342 páginas : _bilustraciones + _e1 CD-ROM (4 3/4 in.) |
||
336 |
_atexto _btxt _2rdacontent |
||
337 |
_ano mediado _bn _2rdamedia |
||
338 |
_avolumen _bnc _2rdacarrier |
||
490 | 0 | _aThe St. Lucie Press/APICS series on constraints management | |
500 | _a´Includes Simplified Drum-Buffer-Rope.´ | ||
504 | _aIncluye bibliografía. | ||
538 | _aRequerimientos de sistema: Windows 95, 98, or NT4.0; minimum 640x480 256 color display; 12 megabytes of free disk space; minimum 16 megabytes of RAM; recommended 32 megabytes of RAM. | ||
650 | 1 | 4 |
_92227 _aAdministración de la producción. |
650 | 1 | 4 |
_94006 _aProcesos de manufactura. |
700 | 1 |
_965992 _aDettmer, H. William., _eautor |
|
942 |
_2ddc _cGEN |
||
991 | _aIND | ||
991 |
_aX0 _bUN@ |
||
997 |
_aHZ _b00 _c20140722 _lUDM01 _h1016 |
||
998 |
_aBATCH-UPD _b00 _c20150424 _lUDM01 _h0433 |
||
999 |
_c67021 _d67021 |
||
900 | _aADM | ||
900 | _aLYM | ||
900 | _aECO | ||
900 | _aSYC | ||
900 | _aPSI | ||
900 | _aAYN | ||
900 | _aDI | ||
900 | _aCDI | ||
900 | _aTC | ||
900 | _aCNT |