000 02112cam^a2200445^a^4500
001 UDM01000150351
003 UDM
005 20210531215518.0
008 150728s2009^^^^njua^^^^^^^^^^001^0^eng^d
020 _a0470391650
_q(cloth)
020 _a9780470391655
_q(cloth)
082 0 4 _a658.5
_bB726p 2009
100 1 _9170787
_aBaker, Kenneth R.,
_d1943-,
_eautor
245 1 0 _aPrinciples of sequencing and scheduling /
_cKenneth R. Baker, Dan Trietsch.
264 3 1 _aHoboken, N.J. :
_bJohn Wiley,
_cc2009.
300 _axv, 493 páginas :
_bilustraciones , .
336 _atexto
_btxt
_2rdacontent
337 _ano mediado
_bn
_2rdamedia
338 _avolumen
_bnc
_2rdacarrier
504 _aIncluye referencia bibliográfica e índice.
505 0 _aIntroduction -- Single-machine sequencing -- Optimization methods for the single-machine problem -- Heuristic methods for the single-machine problem -- Earliness and tardiness costs -- Sequencing for stochastic scheduling -- Safe scheduling -- Extensions of the basic model -- Parallel-machine models -- Flow shop scheduling -- Stochastic flow shop scheduling -- Lot streaming procedures for the flow shop -- Scheduling groups of jobs -- The job shop problem -- Simulation models for the dynamic job shop -- Network methods for project scheduling -- Resource-constrained project scheduling -- Safe scheduling for projects -- Appendix A: Practical processing time distributions -- Appendix B: The critical ratio rule -- Appendix C: Integer programming models for sequencing.
650 1 4 _9346357
_aProgramación de la producción
650 1 4 _9346360
_aProgramación de la producción
_xModelos matemáticos
700 1 _9288377
_aTrietsch, Dan.
_eautor
942 _2ddc
_cGEN
991 _aLYA
_aPR15
_aVillarreal Celestino Bernardo
997 _aRGARZA
_b00
_c20150728
_lUDM01
_h1538
998 _aRGARZA
_b00
_c20150814
_lUDM01
_h1123
999 _c137993
_d137993
900 _aADM
900 _aLYM
900 _aECO
900 _aSYC
900 _aPSI
900 _aAYN
900 _aDI
900 _aCDI
900 _aTC
900 _aCNT