Imagen de portada de Amazon
Imagen de Amazon.com

Improving flow : collected practices and cases.

Colaborador(es): Tipo de material: TextoTextoSeries Insights on implementation | Insights on implementationEditor: New York, NY : Productivity Press, c2006Descripción: viii, 143 páginas : ilustracionesTipo de contenido:
  • texto
Tipo de medio:
  • no mediado
Tipo de soporte:
  • volumen
ISBN:
  • 1563273322
  • 9781563273322
Tema(s): Clasificación CDD:
  • 658.503 I34 2006
Recursos en línea:
Contenidos:
De-coupling and coupling : keys to better cell design -- Cell staffing options (by Vulcan Electric) -- Job shop breaks traditional rules with 1-piece flow cells -- Cells on wheels give company ability to shift course quickly -- Time to take a radical step forward -- Equipment designed through 3P makes a small startup viable -- Takt time can configure a cell -- You may need two takt times -- Reducing scrap paves the way for a big boost in capacity -- Building out of sequence is expensive -- Ford sees its future in flexibility -- Building a better body shop -- Heijunka can help eliminate production peaks and valleys -- Work speeds up as operators move -- Times, not products, set schedule -- 12-hour shifts help tire plant achieve its lean objectives -- What is in your changeover? : probably more than you need -- SMED doubles parts output for metal stamping company -- Calculating changeover costs reveals potential for savings -- Sequencing products leads to least changeover time -- Success with cardboard & duct tape.
Etiquetas de esta biblioteca: No hay etiquetas de esta biblioteca para este título. Ingresar para agregar etiquetas.
Valoración
    Valoración media: 0.0 (0 votos)
Existencias
Tipo de ítem Biblioteca actual Colección Signatura topográfica Estado Notas Fecha de vencimiento Código de barras Reserva de ítems
Libro Biblioteca Central Colección General 658.503 I34 2006 (Navegar estantería(Abre debajo)) Disponible GEN 33409002726622
Total de reservas: 0

Incluye bibliografía.

De-coupling and coupling : keys to better cell design -- Cell staffing options (by Vulcan Electric) -- Job shop breaks traditional rules with 1-piece flow cells -- Cells on wheels give company ability to shift course quickly -- Time to take a radical step forward -- Equipment designed through 3P makes a small startup viable -- Takt time can configure a cell -- You may need two takt times -- Reducing scrap paves the way for a big boost in capacity -- Building out of sequence is expensive -- Ford sees its future in flexibility -- Building a better body shop -- Heijunka can help eliminate production peaks and valleys -- Work speeds up as operators move -- Times, not products, set schedule -- 12-hour shifts help tire plant achieve its lean objectives -- What is in your changeover? : probably more than you need -- SMED doubles parts output for metal stamping company -- Calculating changeover costs reveals potential for savings -- Sequencing products leads to least changeover time -- Success with cardboard & duct tape.

No hay comentarios en este titulo.

para colocar un comentario.

Con tecnología Koha